

The foam mold was made in layers and then stacked and taped: The concrete mix was then poured into the mold and let to set overnight. The concrete mix I used was one part Portland cement to three and a half parts sand.
Here is the final vessel prototype:
A few things to note:
I forgot pretty much the most important part of the vessel, the bottom piece that holds the dirt in! There should also be a top piece as well. Next time though! Also, next time I would make the cement mixture with less sand and more cement. This mix was a bit too crumbly.
No comments:
Post a Comment